- REALE
- CHINA
- 30 days after deposit
- 5 sets a month
REALE walk in type climatic test chamber thanks the trust from customers. In 2018, REALE walk in type climatic test chamber was successfully installed on-site at customers in the United States and Vietnam. equipment with a multi-wing air supply horizontal diffusion vertical heat exchange cycle system, to make the temperature and humidity distribution uniform in the test chamber.
REALE walk in type climatic test chamber
1.The advantages of REALE walk in type climatic test chamber
It is composed of control panel, switchboard, thermal insulation board, blower, heater, humidifier and freezer.Easy assembly and disassembly.
When an abnormal condition occurs, status indicator provides signal warning,the controller screen automatically displays the fault condition, and the display provides troubleshooting methods.
Equipped with multi-wing air supply horizontal diffusion vertical heat exchange cycle system to ensure uniform temperature and humidity in the test room.
Equipped with USB interface and Ethernet communication function, to ensure that the test machine's communication and software expansion functions meet user needs.
2.Meet the standard
Walk in type climatic test chamber meet the requirements of international standard (IEC, JIS, GB, MIL...),Can be designed according to customer needs to meet different standards.
3.Customer trust in Huanrui
REALE walk in type climatic test chamber thanks the trust from customers. In 2018, REALE walk in type climatic test chamber was successfully installed on-site at customers in the United States and Vietnam.
4.Reference parameter
Model | RHPW-4 | RHPW-6 | RHPW-8 | RHPW-13 | RHPW-17 | RHPW-21 | |
System | Balanced temperatuer & humidity control system | ||||||
Testing temperature range | R.T-65℃~+120℃ | ||||||
Humidity range | 20%-95%RH | ||||||
Temperature fluctuation | ±0.5℃ | ||||||
Humidity fluctuation | ±2.5%RH | ||||||
Temperture uniformity | ±2.0℃ | ||||||
Humidity uniformity | ±5.%RH | ||||||
Temperture deviation | ±2℃ | ||||||
Humidity deviation | ±3%RH (≥75%) ±5%RH(<75%) | ||||||
Heat up time | 20℃~+80℃ within 60 minutes | ||||||
Pull down time | 20℃~-55℃,-40℃,-30℃,-20℃,-10℃ within 120 or 90 or 60 minutes. | ||||||
Interior volume(m3) | 9.04 | 12.9 | 16.78 | 27.09 | 35.21 | 43.34 | |
Interior material | SUS#304 Stainless steel plate | ||||||
Exterior material | Model steel | ||||||
Insulation material | Rigid polyerethane foam +glass fibre | ||||||
Floor bearing load | 500Kg/m3 | ||||||
Refrigeration system | Air cooled (Water cooled type is option) | ||||||
Cascade type, hermetic/semitight compressor,CFC free refrigerant | |||||||
Controller | Color LCD screen in English/Chinese, programing,communicating function | ||||||
Safety devices | No welding wire switch,compressor overheating and over current protection,over temperature protection, blower overload protection,dry heating machine protector,low water protection,fault warning system. | ||||||
Power | AC380±10% 50HZ 3 phase 4 ires+ground wires |